- Let’s get this project started!
- Where our elevator shaft is going.
- Walkway to the new elevator shaft.
- 1) Pre demo
- 2) Post demo
- Protect the site! Protect it.
- Take all the dirt out, and recompact it back in.
- Start digging our footers.
- Compacting out our site in preparation for concrete.
- And now there’s concrete!
- Our elevator shaft is an additional 8″ deeper.
- That’s some clean lines…
- Time to Start Framing!
- Tying into the existing structure.
- A new doorway.
- Starting on the second floor.
- The walls of the elevator shaft.
- From the side.
- The first full view of the new structure.
- Then the panel it.
- Front View
- Side View
- Hmm… needs something.
- Ah! A window!
- Getting Ready for Stucco
- Looks Nice and smooth.
- Replacing the flagstone.
- Beautiful, but we should take a look inside.
- Old Niche.
- Matched.
- Tile Was Matched
- Let’s take a look in the storeroom.
- Ah! Can’t See anything.
- Let’s turn on the light.
- Add sometime tile.
- Add the HVAC equipment and clean it.
- This door needs to be stained.
- Better.
- Doors to match existing.
- First look inside the elevator.
- Another angle.
- Another beautiful house.
- Another beautiful yard.
- Another Milestone.